SHAH WA ARUS HYDRO POWER PLANT

CLIENT: AFGHANISTAN MINISTRY OF
ENERGY AND WATER
GENERAL CONTRACTOR: TPT JV
PARSAB NIROO SERVICES: Engineering
PROJECT LOCATION: Kabul Province
PROJECT SPECIFICATION:
Horizontal Francis turbine: 2*650kW
Step-up transformer: 2NOS./0.4-20 KV
Generator voltage: 400 V
Turbine speed: 1000 rpm
Design net head: 57 m
Nominal Discharge: 1.25 m3/s