CHAK-E-WARDAK HYDRO POWER PLANT RENOVATION





CLIENT: AHCC Co. (Alhasshim Construction COMPANIES)
Contractor Servises: EC (Project Management, Engineering, Construction of Hydro-mechanical Equipment, Transmission Line, Power plant and Substation)
Location: Afghanistan, Wardak Province
PROJECT SPECIFICATION:
Hydropower plant Capacity : 3×1.3 MW
Turbine Type: Horizontal Fransis
Generator Type: Synchronous, 690 V
Substation:
24 kV (rating 36kV)
No. of Panels: 11 Set
No. of Transformers: 3×1800 KVA
Power Transmission Line:
MV (20 KV): 85 km
LV Distribution Network ( 400 V): 64 km
No. of Electrified Village : 63
Pipe Line:
Polyethylene, DN.:450 , PN 10: length: 1,850 m
Polyethylene, DN.:450 , PN 12.5: length: 2,290 m
Steel Pipe, Sch. 10, DN: 12″”, length: 1,145 m
Hydro-Mechanical Equipment:
Rehabilitation of Dam Overflow Gateswith Operation system: 3 Sets/ 6×4 m
Canal Intake Gates with Operation system: 2 Sets / 3.8×4.2 m
Penstock Intake Gates with Operation system: 1 set / 5×3.5 m
Forebay Overflow Gate with Operation system: 1 Set /4.5×2 m
Rehabilitation of Penstock: 200 m/ D=2.2 m”