CLIENT: REGIONAL WATER COMPANY
GENERAL CONTRACTOR: ALHASHIM CONSTRUCTION Co.
PARSAB NIROO Services:
Design, Procurement, Construction & Installation of Pump
Station, Transmission Pipeline, Equipment and SCADA
System“
LOCATION: Balkh Province
PROJECT SPECIFICATION:
Design Flow of Pump station System: 400 l/s
Design Head of Pump Station: 96m
HDPE Pipe Line Specification: DN 560
Pipe Line Length: 1720 m
No. of Elevated Reservoir: 1
Volume of Reservoir: 250 m3
PARSB NIROO was founded as an EPC Contractor in 2016 as a subsidiary of BLUE&P Group with the intention of concentrating its activities on the Water and Sewage sectors within this Group. Our main activities are classified into these major categories including: Hydro Power, Dam, Pump Station, Water and Sewage Treatment, Transmission Pipeline.