Chak e Wardak‌ – Afghanistan

Chaki Wardak Micro Hydro Power Plant
Client : Afghanistan Ministry of Energy and Water
General Contractor: PARSAB NIROO ILE of BLUE&P

About seventy years ago, the power energy of the Chak Wardak dam for the first time had lit the presidential citadel. But now, instead of the elites, this electricity will light up 4,000 homes of rural families. By the end of the year, all three turbines will be activated and dam will have the capacity to produce around four megawatt of electricity. ‌

  • Micro Hydropower Station (MHS) Capacity :3×1.3 MW
  • Substation: 20 KV (rating 36kv)
  • Power Distribution Network: 120 km
  • Gates for canal and penstock: 4 sets

Dahane Dare – Afghanistan

Dahane Dare Dam and Hydro Power Generation Planet
Client : Afghanistan Ministry of Energy and Water
General Contractor : PARSAB NIROO ILE of BLUE&P

Design & Construction Management of “Design-Build of Dahane Dara Dam” Project Faryab Province

  • Dam Height: 64 m
  • Dam type: Rock fill
  • Total reservoir volume: 27 MCM
  • Powerhouse capacity: 1.5 MW
  • Irrigation Network: 3000 hectares

Shah Wa Arus – Afghanistan

Design & Installation of Electrical, Mechanical, Control & Instrumentation Equipment of Shah Wa Arus Power Plant
Client : Afghanistan Ministry of Energy and Water
General Contractor : PARSAB NIROO ILE of BLUE&P

  • Horizontal Francis turbine :  2*650kW
  • Step-up transformer : 2NOS./0.4-20 kv
  • Generator voltage : 400 v
  • Turbine speed : 1000 rpm
  • Design net head : 57 m
  • Nominal Discharge : 1.25

Contact PARSAB NIROO for more information

Contact us